Deleray Residence - Renovations, Turlock, CA
Wood-Framed, conventional raised floor foundation system
Customer: Don Deleray
Project phase: Under Construction (2009)
Marusal Residence, Los Angeles, CA
New Construction of metal building framing system
Customer: Knight Buildings System, Inc.
Project phase: Approval Process in 2008
Fenderson Residence - Balcony Assessment,
Modesto, CA
Customer: A.P. Fenderson
Project phase: Completed in 2008
Babbitt Residence - Detached Garage,
Turlock, CA
Metal Building Review and Foundation design
Customer: Allen Babbitt
Project phase: Completed in 2008
Armstrong Residence - Renovations,
Ripon, CA
Customer: Stuart McClanahan Construction
Project phase: Completed in 2008
Diablo Grande Villa Lot 27 - Deck Design Review, Patterson, CA
Customer: Stuart McClanahan Construction
Project phase: Completed in 2008
10039, 10047 Victor Rd. - Solar Panel Installation, Victor, CA
Assessment of existing pre-engineered metal building system
Customer: OUL-ER FOR SOLAR
Project phase: Completed in 2008
Boyett Residence,
Modesto, CA 400 sq. ft.
New Construction of Outdoor BBQ Roof Structure
Customer: Stuart McClanahan Construction
Project Phase: Completed in 2007
Terrones Residence,
Modesto, CA 189 sq. ft.
Detached Patio
Customer: Marcello Terrones
Project Phase: Completed in 2007.
Sigona Residence,
Modesto, CA 634 sq. ft.
Trellis and Patio Addition
Customer: Rush Creations
Project Phase: Completed in 2006.
Kelley Residence, Hickman, CA 1,200 sq. ft.
Metal Building foundation Design
Customer: Marie J. Kelley
Project phase: Completed in 2006
Douglas Residence,
Modesto, CA 207 sq. ft.
Trellis Addition
Customer: Rush Creations
Project Phase: Completed in 2006.
Conrad Residence,
Modesto, CA 1227 sq. ft.
Remodel Single-Story Wood-Framed, conventional raised-floor foundation system
Customer: Michele Lacy Interiors
Project Phase: Completed in 2006.
Woolley Residence,
Hickman, CA 473 sq. ft.
Pool House Addition
Customer: Robert and Jane Woolley
Project Phase: Completed in 2006
Bower Residence, Valley Springs, CA
3,555 sq. ft.
Single-Story Wood-Framed, conventional
raised-floor foundation system
Customer: Gary & Cynthia Bower
Project phase: Construction completed 2005
Katakis Estate, Modesto, CA 12,661 sq.
ft
Two-Story Wood-Framed, conventional raised-floor
foundation system
Customer: California Equity Management Group, Inc.
Project phase: Construction completed 2005
Grimes Residence – Room &
Patio Addition, Modesto, CA
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: Derek Grimes
Project phase: Completed in 2005
Follet Residence – Garage Restoration,
Modesto, CA 500 sq. ft.
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: COIT Restoration
Project phase: Construction Completed in 2004.
Sousa Residence - Addition, Denair,
CA 636 sq. ft.
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: Mr. & Mrs. Dave & Christine Sousa
Project phase: Completed in 2004
Soares Residence - Addition, Modesto,
CA
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: Constantino Soares
Project phase: Completed in 2004
Detached Garage, Modesto, CA 528 sq.
ft.
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: Eddie Neesan
Project phase: Completed in 2003
Galde Residence – 2-story Addition,
Sonora, CA 1,000sq. ft.
Single-Story Wood-Framed, conventional
raised-floor foundation system
Customer: Ceraban Design, AIA
Project phase: Completed in 2003
Costa Residence – Porch Enclosure,
Modesto, CA
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: Costa
Project phase: Completed in 2003
Detached Addition, Modesto, CA
Single-Story Wood-Framed, conventional
concrete slab-on-grade foundation system
Customer: Reis Construction
Project phase: Completed in 2003
Simpson
Residence – Loft Addition, Modesto, CA
Wood-Framed, conventional concrete slab-on-grade foundation
system
Customer: Steven Simpson
Project phase: Completed in 2003
Carrion Residence
– Addition, Salida, CA
Wood-Framed, conventional concrete slab-on-grade
foundation system
Customer: Victor Construction
Project phase: Completed in 2001
Randy
Pombo Residence – Basement Addition, Tracy, CA
2-Story Wood-Framed, conventional raised-floor
foundation system. Entire house was lifted and relocated
in order to add a basement constructed of CMU block
retaining walls.
Customer: Randy Pombo
Project phase: Completed in 2001
Gavino
Residence – Addition, Modesto, CA
Wood-Framed, conventional raised-floor
foundation system.
Customer: Lupe Gavino
Project phase: Completed in 2001
Fuentes
Residence – Loft Addition, Turlock, CA
Wood-Framed, conventional concrete slab-on-grade
foundation system
Customer: Jess Holt General Contractors
Project phase: Completed in 2001